Abstract

Currently in the New Civil Code, which has incorporated provisions from the old Civil Code and the old Commercial Code, Article 1536 states that in the case of obligations other than those for the payment of a sum of money, late performance always entitles the debtor to damages equal to statutory interest, calculated from the date on which the debtor is in default on the money equivalent of the obligation, unless a penalty clause has been stipulated or the creditor can prove greater damage caused by the delay in performance. Therefore, according to common law, for late performance of the contract or for non-performance of contractual obligations, if penalties for late performance have been stipulated in the contract, it means that liability for that breach has been definitively settled and damages can no longer be claimed, since it is considered that the penalty clause stipulated in the contract has determined in advance the damages that the debtor will pay.

Downloads

Published

2023-12-31

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.